What GAO Found The Navy is currently 24 months behind in its efforts to modernize three DDG 1000 Zumwalt class destroyers to host the Conventional Prompt Strike (CPS) hypersonic missile as part of its surface strike mission. Both the DDG 1000 and CPS efforts face challenges: Although modernization of the first ship in the class, USS Zumwalt (DDG 1000), was 94 percent complete as of January 2026, it is behind schedule due to unplanned work. The DDG 1000 class ships have unique systems, such as its radar, combat, and network systems, that are costly and difficult to sustain and maintain. The CPS effort was originally scheduled to begin flight testing on the DDG 1000 class in 2025 but this is..
Reported by Maria LopezNavy Ship Modernization: DOD Needs Comprehensive Strategy to Field Hypersonic Missile Capability.
The item is dated Fri, 17 Jul 2026 07:10:42 -0400.
TeamCog is carrying it as a audits report from GAO reports and testimonies RSS.
What GAO Found The Navy is currently 24 months behind in its efforts to modernize three DDG 1000 Zumwalt class destroyers to host the Conventional Prompt Strike (CPS) hypersonic missile as part of its surface strike mission.
Both the DDG 1000 and CPS efforts face challenges: Although modernization of the first ship in the class, USS Zumwalt (DDG 1000), was 94 percent complete as of January 2026, it is behind schedule due to unplanned work.
The DDG 1000 class ships have unique systems, such as its radar, combat, and network systems, that are costly and difficult to sustain and maintain.
The CPS effort was originally scheduled to begin flight testing on the DDG 1000 class in 2025 but this is…